The Cost of a Building Error

Posted: Mon Jul 26, 2010 12:36 am
by _The Mighty Builder
The Mormon Church is currently troubled by the structural deterioration of the Church Office Building (COB).

When constructed the metal skeleton was clad with precast concrete slabs. This was done at great savings compared to other types of cladding considered by the Mormon Church. It is cheap, easy to install and was suppose to last for centuries. This cladding system was also used on the Mexico City temple when it was first built. In the correct environment it is a very suitable system. However as the Mormon Church has discovered in the wrong environment it is a disaster.

Several years ago a piece of cladding fell off the Mexico City Temple. Forensics discovered that the rebar used in the concrete had begun to deteriorate (rust) due to the hygroscopic properties (affinity for water) of unsealed concrete. Given the humid/wet environment of Mexico City the rusting of the rebar caused it to swell. This swelling puts great pressure on the concrete until it cleaves along a fracture plain and fails. The result is concrete patches falling from the sky. It became so critical at the Mexico City Temple that the Mormon Church had no choice but to close the temple and re-clad it with another material, in this case a Granite. $40 Million dollars was spent on the refurbish/remodel of the temple.

Well, the same thing is happening with the COB. Though no material has fallen off the building, it is continuing to deteriorate. It was thought at first that some sort of stabilization could be done on the material. But nothing tried so far works.

Well we got the estimation for refurbish/remodel of the COB – 1.34 Billion Dollars.

Re: The Cost of a Building Error

Posted: Mon Jul 26, 2010 12:50 am
by _quaker
Cheaper to demolish and rebuild.

When was the COB built? Did waterproof epoxy coated rebar exist at that time or is it relatively new?

Re: The Cost of a Building Error

Posted: Mon Jul 26, 2010 12:51 am
by _Tchild
1.34 billion to reclad and replace the iron rebar structure of the COB? That seems excessively expensive. It seems you could tear down the building and rebuild a whole new structure for one third to half that price.

If I recall, the beautiful American Stores building built in the nineties (1998) cost about 400 million.

Image

No matter the price, it would be costly.

Re: The Cost of a Building Error

Posted: Mon Jul 26, 2010 1:07 am
by _The Mighty Builder
Epoxy Coated Rebar is relatively new (1980's). The COB was constructed in the early 70's.

The US DOT (Highway Administration) conducted extensive research on the benefits vs. cost of epoxy coated (green) rebar. Their research found that projects that used the green rebar had resistance to the environmental failure caused by moisture invasion such that NO federal project can be built without green rebar.

To address the Cost, you have to remember that the Mormon Church has NEVER hit budget on ANY construction project. For example the Church Conference Center was budgeted at $485 Million, final Cost $1.2 Billion. City Creek Center original estimate for construction $600 Million, $1.2 Billion, $1.5 Billion, $1.75 Billion, $2.2 Billion, $2.5 Billion, $3.5 Billion to its Current $4.5 Billion. So yeah, the Beautiful American Stores building came in at $400 Million, but it didn't have the Lords special blessings.

Re: The Cost of a Building Error

Posted: Mon Jul 26, 2010 1:11 am
by _Markk
1.3 billion...how big is the COB? I find that hard to believe...but you never know. how are they going to stabilize the structure? My experience, on allot smaller scale, when this happens in coastal concrete beam construction is to demo it and start over, or "incapsulate' it and basically build a new structural frame around and through it with epoxy, through bolts, and allot of steel. We use moment frames and seismic assemblies in URM allot and it seems to do well. But when the rebar goes from the inside out it usually has to go, the cc will spawl and the reinforcment disapear. My guess is that the GSL is much like the costal issues we have here in so cal. Galv. or epoxy coated rebar is the ticket.


MG

Re: The Cost of a Building Error

Posted: Mon Jul 26, 2010 1:19 am
by _The Mighty Builder
Remember this is a Renovation/Remodel. The Mormon Church is going to Seismically stabilize (earthquake proof) the Building, remodel the interior, re-clad the exterior, upgrade the utilities and other necessary things. The building is quite old and was poorly constructed on a shoe string budget when first built.

For example if you have ever been in the underground parking structure you will notice that it "rains" on the different levels. This is due to poor construction practices that didn't water-proof the structure. The HVAC system is so inadequate that the COB is considered a SICK Building where mold/mildew and other pathogens have been growing in the walls and ductwork.

Re: The Cost of a Building Error

Posted: Mon Jul 26, 2010 1:25 am
by _Tchild
The Mighty Builder wrote:To address the Cost, you have to remember that the Mormon Church has NEVER hit budget on ANY construction project. For example the Church Conference Center was budgeted at $485 Million, final Cost $1.2 Billion. City Creek Center original estimate for construction $600 Million, $1.2 Billion, $1.5 Billion, $1.75 Billion, $2.2 Billion, $2.5 Billion, $3.5 Billion to its Current $4.5 Billion. So yeah, the Beautiful American Stores building came in at $400 Million, but it didn't have the Lords special blessings.


OUCH!! Are you sure on the conference center costs? I ask, because I had a client who installed the conference center seating and he had a source that relayed to him a roughly 450 million dollar price tag. I can see a few deca-million dollar overruns, but a discrepency from $485 to a staggering 1.2 billion is one helluva budget miss.

4.5 Billion on the current City Creek? Just curious, but are you privy to the church's construction budgets? Not even the media has disclosed that large of a number.

Re: The Cost of a Building Error

Posted: Mon Jul 26, 2010 1:32 am
by _The Mighty Builder
If you take a tour of the Conference Center the helpful guides proudly boast of the $1.2 Billion dollar cost.

No, the media is unaware of the current cost. However if you notice the Mormon Church keeps incrementally increasing the cost. Publicly its at 2.85 Billion. In our last meeting with the Owner and Architectures it was announce that we should be proud to be working on a $3.0 Billion dollar project. And in private we have been told the current completion cost is $4.5 Billion. The cause of the overrun? CHANGE ORDERS. The Owner is issuing about 100 Change Orders per day.

Re: The Cost of a Building Error

Posted: Mon Jul 26, 2010 1:35 am
by _Blixa
I recall when it was first constructed there were multiple problems with the COB right off the bat. I may be remembering this incorrectly, but weren't the large "basins" that sit in front of the hemispheres on North Temple side of the building supposed to originally be "eternal flame" features? The gas fittings didn't work out so they were retro-styled into the dumpy stumpy "planters" they now are (they've been changed a bit over the years, If I recall correctly, the "basin" part used to rest on legs that gave them the caldron-y look such landscape/memorial features often have).

Re: The Cost of a Building Error

Posted: Mon Jul 26, 2010 1:43 am
by _zeezrom
Why not lease office space downtown?
There is plenty of space